A 2026 tutorial on Argo Rollouts for edge fleets — canary and blue-green strategies, analysis templates, metric gates, and rollback for constrained sites.
Production Backstage 1.30 IDP setup — software catalog, scaffolder templates, TechDocs, auth plugins, and a working docker-compose stack with PostgreSQL and Kubernetes ingestion.